As discussed during our several meetings as well as through the business correspondence, we have restructured our corporate identity where we have formed Al Hamra Hotels Management to separate clearly the products where we have the following structure:
a) Al Hamra Fort Hotel & Beach Resort *****
Report: Al Hamra Fort Hotel, we have no construction whatsoever that may disturb the clients. There are two Villas that view the construction site of Al Hamra Palace, which may cause some eye soaring vision. Those two villas have been allotted for the corporate market and therefore, we guarantee that no disturbance at Al Hamra Fort Hotel.
b) Al Hamra Village Town House*****
Report: It is situated at 500 meters away from the main hotel & villa complex where by now has it's two phases. Thus, the construction is totally completed within the town house. The only project-taking place is the Al Hamra Palace Hotel where it is located 500 meters away from the partition wall, which is built to mark the border for the beach access of Al Hamra Village clients. This will be clearly highlighted on the attached map. The new wing from the Townhouse, which is over viewing the golf course that may be affected since the course is not yet green. Moreover, from some of those townhouses golf view, the construction of the palace can be seen to the extreme hand side if client intended to view from their balconies, but does not constitute any physical or even sound disturbance, it could only be an eye soaring object. But, the beauty of the golf course when it is all green will overcome any other distractions.
c) Al Hamra Palace Hotel*****
Report: The Palace project is directly positioned opposite to the golf course where the construction have reached fourth floor of the structure. This area is covered, but can only be seen or noticed through the pedestrian who prefers to walk between the beach access from Al Hamra Village and/or Al Hamra Fort.
d) Khatt Springs Hotel & Spa*****
Will follow with soft opening promotion as of 01 June 2006
ADDITIONAL PROJECT REPORT ON ON-GOING DEVELOPMENT AT AL HAMRA FORT
Al Hamra Golf Course/Club House Project
The construction of the golf course have attained a very advanced level where we have created the lights on the entire 9 holes with flood lit. Currently, in the process of sowing the course and some areas begins to get green. We planted the trees and we are in the course of action in arranging the proper foundation of the holes. The roads within the course are already set-up. The movement of the vehicles within the course is very minimal since they are placing the seeds of the grass, which have been spreaded over the nine holes.
In regard to the time schedule, we are ready by July 2006 to operate the clubhouse, which is now under construction and is taking place at the old helipad, which is by the lagoon before the main arch entrance to Al Hamra Fort Hotel, it does not constitute any disturbance whatsoever. The driving range as well as the Golf Academy will be operated by July 2006. The golf course 9 holes will be fully operational by end of September 2006.
Резюмируя на сегодняшний момент: основное здание продавать можно и нужно, виллы - также, таунхаузы - с оговоркой, что ехать в отель и к пляжу на электромобильчике, Пэлас - строится на уровне начала пятого этажа и не мешает гостям, гольф-поля вскоре заработают, отель Хатт вот-вот начнет продаваться, пляжная линия комплекса на сегодня составляет 2,5 км.